Technical reference: IEC 61537:2023 (Edition 3.0) | Updated: November 2026 | Reading time: approximately 12–15 minutes
Quick answer: IEC 61537 provides requirements and test methods for cable tray and cable ladder systems. A safe working load (SWL) is meaningful only when it is linked to a defined product configuration, installation orientation, support span, joint arrangement and test evidence. A tray width or steel thickness on its own cannot establish an allowable load. Before approving a system, engineers should examine the applicable load test, measured deflection, support arrangement and the scope of the test report.
This guide explains how to read IEC 61537 load test information, distinguish SWL from test load and failure load, review deflection, and prepare a defensible technical submittal. It includes a documented example from an SGS verification report publicly hosted on the Hongfeng website. The example concerns stainless steel perforated cable trays; it must not be presented as a universal rating for cable ladders or other product families.
At a glance
Standard: IEC 61537:2023 (Ed. 3.0) | Key metric: SWL at the declared span and installation arrangement | Real example: SGS report QDPL2406001066TF-5, single span of 1,200 mm.

1. What Does IEC 61537:2023 Cover?
IEC 61537:2023, Cable management — Cable tray systems and cable ladder systems, is the third edition of the international standard. It addresses requirements and tests for systems intended to support and accommodate cables in electrical and communications installations. It covers more than the visible tray length: the relevant system configuration can include lengths, joints, fittings and support devices.
The 2023 edition replaced IEC 61537:2006. Its technical revisions include updated safe working load (SWL) procedures, revised corrosion classification, additional arrangements for vertically mounted routes, and specific support-device tests. For procurement, this means the edition shown on the report matters. A result reported against an older edition is not automatically a test against the 2023 edition.
The standard does not cover conduit systems, cable trunking systems or cable ducting systems as defined in its scope. These products may be subject to different standards and project requirements. A supplier should identify the correct product category before citing a compliance document.
See the IEC official description of IEC 61537:2023 for the publication and scope.
2. What Is Safe Working Load (SWL)?
Safe working load (SWL) is the maximum load declared to be safely applied in normal use under the specified conditions. In cable tray procurement, an SWL figure must be read together with its support span, installation arrangement, product design and stated limitations.
| Term | What it tells an engineer | What it does not mean |
|---|---|---|
| SWL | Declared permissible working load for a specified arrangement | Not a universal capacity for every span and installation |
| Applied test load | Force applied during a documented test stage | Not automatically the permissible service load |
| Ultimate or failure load | Load associated with a failure criterion if determined | Not an allowable design load |
| Deflection | Measured movement of the tray under load | Not the same as structural failure |
| Support span | Distance between centers of adjacent supporting devices | Not necessarily the manufactured length of a tray section |
Example: Two 600 mm wide trays made from the same material may have different SWL values if their side heights, thicknesses, reinforcement, joint arrangements or support distances differ. The same tray also cannot be assumed to have an unchanged SWL when its support spacing is increased.
Related reading: For everyday load estimation and terminology, see the HFJD Cable Tray Load Capacity Guide. This article focuses specifically on test evidence and reporting.
3. How Are Cable Tray Load Tests Performed?
An IEC 61537 load test is a controlled evaluation of a representative system arrangement, not simply a weight placed on an isolated length of steel. The applicable test method depends on how the system is installed.

3.1 Identify the specimen
The documentation should identify the model, material, width, side height, thickness, length and structural form. The sample’s joints, couplers, fasteners and relevant supporting devices should be recorded where they affect the test arrangement.
3.2 Define the support arrangement
Engineers should determine the span between support centers, number of spans, orientation, joint location and any end overhang or restrictions. A single-span result should not be silently treated as a multiple-span result, and a horizontal result should not be assumed to cover a vertical installation.
3.3 Apply and measure loads
Uniformly distributed loads (UDL) are relevant to many cable tray applications, but the test method and loading arrangement must match the required clause. Testing records should state the applied load, measurement locations, deflection results and final verdict. Where the report includes a higher-load integrity check, that outcome should remain separate from the declared SWL.
3.4 Understand the scope of individual tests
| IEC 61537:2023 topic | What the review should distinguish |
|---|---|
| Clause 10.3 | Lengths mounted horizontally and running horizontally over multiple spans |
| Clause 10.4 | Lengths mounted horizontally and running horizontally on a single span |
| Clauses 10.5–10.6 | Specified vertically mounted configurations and route orientations |
| Clause 10.7 | Fittings such as defined bends, tees and crosses |
| Clause 10.8 | Support devices, including brackets and suspended support arrangements |
These references help reviewers locate the relevant test family; they do not substitute for applying the full official standard, including all its conditions and acceptance requirements.
For installations where supports and spans change along the route, see our Cable Tray Support Spacing Guide.
4. How Are Deflection and Acceptance Assessed?
Longitudinal deflection is the vertical movement along the span under load. Transverse deflection describes movement measured across the tray width. An acceptable specimen must satisfy the requirements applicable to the test configuration, not merely avoid collapsing.
For the single-span test documented in the SGS example below, the report checks practical mid-span deflection against 1/100 of the tested span, and transverse deflection against 1/20 of the tested tray width. These values are presented here in the context of that report’s test arrangement; do not apply them indiscriminately to every system component or orientation.
At the reported 1,200 mm test span, a 1/100 span criterion corresponds to 12 mm. The reported transverse limits are 15 mm for a 300 mm wide specimen and 30 mm for a 600 mm wide specimen. In both cases, the actual measured values are required to judge the result.
A useful report therefore provides measured deflection, applicable allowable deflection and test verdict side by side. A standalone statement such as “heavy duty” or “high load capacity” is not an adequate substitute.
5. Real Report Example: SGS Verification Results
A publicly available SGS-CSTC verification report, No. QDPL2406001066TF-5, issued on 2 August 2024, cites IEC 61537:2023 and identifies the tested product family as stainless steel perforated cable tray. The applicant and manufacturer named on the report are Shandong Hongfeng Electric Group Co., Ltd. The report gives representative model references HF-S6-P-01A-30020-E8 and HF-S6-P-01A-600100-E8.
Report-holder clarification: The SGS document names Shandong Hongfeng Electric Group Co., Ltd. as applicant and manufacturer. This is not the same legal name as Shandong Hongfeng Electric Power Technology Co., Ltd. (HFJD). Any claim that a particular HFJD product is covered requires confirmation of product identity, the relationship between entities and the right to use the document.
The single-span test results reproduced below are from the report’s page 19. They are included to show how engineers should read an actual load test record, not to advertise a universal HFJD load rating.

| Reported specimen | Width × height | Thickness | Test span | SWL | Longitudinal deflection (measured / limit) | Transverse deflection (measured / limit) |
|---|---|---|---|---|---|---|
| HF-S6-P-01A-30020-E8 | 300 × 200 mm | 1.5 mm | 1,200 mm | 2,680 N/m | 6.366 / 12 mm | 6.580 / 15 mm |
| HF-S6-P-01A-600100-E8 | 600 × 100 mm | 2.0 mm | 1,200 mm | 2,680 N/m | 6.074 / 12 mm | 24.244 / 30 mm |
In the same reported test table, both specimens are marked as passing the reliable-support assessment and an increased-load check at 4,556 N/m (1.7 × the declared SWL) without collapse. This does not convert 4,556 N/m into the approved working load. The listed SWL remains 2,680 N/m for the documented test configuration.
Important limitations: These are specific stainless steel perforated tray specimens tested over a 1.2 m span. The table does not establish a rating at 1.5 m, 2.0 m or 3.0 m spans; it does not qualify an untested ladder tray, all galvanized variants, all fittings or all support assemblies. For project approval, confirm the actual supplied model, the full report, the named manufacturer and any relationship between the report holder and the supplying legal entity.
6. How to Interpret N/m, kg/m and Support Span
A load per meter can be reported as a force per unit length (N/m) or expressed as an equivalent mass per unit length (kg/m) for practical discussion. They are not the same unit: under standard gravity, a mass of 1 kg corresponds to approximately 9.81 N of weight.
As an illustrative cable schedule, four cables weighing 8 kg/m each plus two cables weighing 3 kg/m each produce 38 kg/m of installed cable mass. The corresponding gravitational load is approximately 373 N/m, before reviewing applicable allowances, other attached loads and project-specific design conditions.
This calculation is not a product approval. The engineer must compare the complete design load with an SWL supported by a test or validated load-span declaration for the actual tray and support configuration. If a supplier provides a result only at 1.2 m span, it should not be extrapolated to 1.5 m without appropriate engineering evidence.
7. Can Perforated Cable Tray Results Be Used for Cable Ladders?
Not automatically. A perforated tray has a sheet-metal base and side walls, whereas a cable ladder has side rails and spaced rungs. Their load paths, local deformation behavior, connection details and support interactions can differ substantially.

A report on a stainless steel perforated tray is useful evidence for that identified tray configuration. It should not be marketed as an IEC 61537 mechanical load test certificate for a heavy-duty cable ladder without an applicable ladder test report, a documented coverage rationale or other project-accepted evidence.
The same principle applies to fittings and supports: a straight length test does not, by itself, establish the capacity of a 90° bend, a tee, a cantilever arm, an overhead trapeze assembly or a wall anchor.
Compare the Stainless Steel Perforated Cable Tray with the Hot-Dip Galvanized Cable Ladder and Long Span Cable Ladder. These are different designs and must be reviewed on their own evidence.
8. How to Review a Manufacturer’s Load Test Report
When a supplier submits an IEC 61537 report, engineers and procurement teams should review the complete document rather than the front-page compliance statement alone.

- Check the standard and edition. Confirm IEC 61537:2023 or the edition explicitly required in the project specification.
- Check the legal entities. Identify the applicant, report holder, manufacturer and supplier; clarify any differences.
- Identify the tested product. Record model, type, material, thickness, width, height and section length.
- Verify the mounting arrangement. Confirm orientation, single or multiple spans, support center distance and restraint conditions.
- Check joints and fasteners. Ensure connector position and fixing method are representative of the proposed installation.
- Compare the declared SWL with results. Keep SWL separate from proof loads or collapse loads.
- Review measured deflection. Look for longitudinal and transverse values and their applicable limits.
- Check which clauses were tested. A marked “N/A” is not evidence of a passed test.
- Confirm report integrity. Check report number, issue date, page count, issuing organization and whether the complete document is provided.
- Review laboratory status if required. If a project requires an accredited independent laboratory, obtain evidence that the relevant activity falls within the laboratory’s accreditation scope; the presence of a well-known testing brand is not enough on its own.
Joint hardware should be treated as part of the system definition. See the existing Cable Tray Coupler Plate Connector product page for an example of available connection hardware.
9. How to Check a Proposed Cable Tray Installation
Design verification needs to connect the cable schedule, tray specification and mounting system. A practical sequence is:

- Calculate the actual cable mass per meter from the cable schedule, including future loads only where the project requires them.
- Define the proposed tray configuration: perforated or ladder, steel or stainless steel, width, side height, thickness and section length.
- Specify support center spacing and distinguish regular straight runs from transitions, bends, risers and equipment entry points.
- Obtain the applicable load-span data and match it to the project configuration. Do not substitute an unrelated model or a shorter tested span.
- Check support and anchor capacity separately. The bracket, trapeze channel, threaded rods, beam clamps and building anchors may govern the assembly’s capacity.
- Review environmental and electrical requirements, including corrosion exposure, temperature, bonding/continuity and any additional project specification.
- Record assumptions and approvals in the engineering submittal, with the exact report and drawing revisions.
For a broader introduction to route spacing, see the Cable Tray Support Spacing Guide. For general weight and loading concepts, read the Cable Tray Load Capacity Guide. Those articles support planning, while the product-specific test record remains the evidence for a declared rating.
To plan the supporting framework, review C Channel Steel Strut and the Cable Tray Supports & Brackets category. These are product references, not system load certifications.
10. Technical Submittal Checklist for EPC and Industrial Buyers
Before placing an order, request the following information from the proposed supplier. This checklist can also be pasted into an RFQ or technical bid evaluation sheet.
| Document / data | Minimum information to request | Why it matters |
|---|---|---|
| Product drawing | Section dimensions, thickness, hole pattern, rung spacing if applicable | Identifies the intended construction |
| Material and finish | Base material grade, galvanizing or stainless specification | Matches the operating environment |
| Load-span declaration | SWL units, support span, orientation and applicable model | Connects load rating to installation |
| Test report | Full report, edition, model, test clause, measured deflections and verdict | Documents the basis for the claim |
| Joint and fitting details | Coupler type, splice position, fastener list, fitting drawings | Prevents mismatched connections |
| Support system details | Bracket or trapeze drawing, fixings, support loading data | Reviews the complete load path |
| Quality documents | Material certificates, inspections and applicable test records | Supports traceability |
| BOQ and packing information | Quantities, standard lengths, fittings, covers and destination | Supports accurate procurement and logistics |
11. Common Specification Mistakes
- Using width and thickness as the only load criteria. Side profile, material, span, joints and supports matter as well.
- Confusing test load with SWL. An increased-load check is not the design working limit.
- Ignoring the test span. A 1.2 m result cannot simply be transferred to 1.5 m or 3 m.
- Assuming one report covers every product. Tray, ladder, fittings and supports may require separate evidence.
- Treating a verification report as universal product certification. Confirm the document type, exact model and reporting organization.
- Ignoring the report edition. Verify whether the project requires the 2023 edition or another identified adoption.
- Overlooking support hardware. A strong tray does not compensate for an inadequately rated bracket or anchor.
12. Frequently Asked Questions
Is IEC 61537:2023 the latest edition?
IEC identifies IEC 61537:2023 as Edition 3.0, replacing the 2006 edition. Buyers should also check the specific national adoption or project-required edition.
Does IEC 61537 specify one maximum load for all cable trays?
No. The applicable working load depends on the declared system configuration and supporting evidence. There is no universal SWL that can be applied to every width, material or span.
What does SWL mean in a cable tray report?
Safe working load is the declared maximum load for normal use under the stated test and installation conditions. It is not the same as the load at failure.
Can a 1.2 m load test prove a 1.5 m installation is safe?
Not by itself. The proposed 1.5 m span needs applicable manufacturer load-span data, additional testing or an engineering assessment acceptable for the project.
Are IEC conformity statements and third-party test reports the same?
No. A manufacturer’s declaration, a laboratory verification or test report, and a product certification can have different scopes and assurance processes. Read the actual document and confirm what it proves.
Do cable ladder fittings and support brackets need separate evaluation?
Where required by the design and applicable standard, yes. A straight section’s load data does not automatically establish the performance of bends, tees, cantilevers, trapezes, rods or anchors.
Can galvanized, stainless steel and aluminum trays share one load rating?
Do not assume so. Material properties and structural configuration can differ; use approved test evidence or validated engineering data for the specified version.
What information should I send to obtain a load test report or technical review?
Provide the tray or ladder type, dimensions, material, thickness, length, required support span, estimated load, installation orientation, support drawing, project standard and destination. Include the BOQ or cable schedule where available.
13. Related HFJD Products and Engineering Support
HFJD supplies cable management products including Stainless Steel Perforated Cable Tray, Hot-Dip Galvanized Cable Ladder, C Channel Steel Strut, and related supports and brackets.
For an RFQ, share your project specifications and supporting drawings so the relevant product model, technical documentation and available test evidence can be checked against the intended use. Report availability and applicability must be confirmed for each requested configuration.
Request product information or a quotation: Contact HFJD | Submit a technical inquiry.
14. References and Document Limitations
- International Electrotechnical Commission — IEC 61537:2023, Edition 3.0. Official scope and edition information.
- SGS-CSTC verification report QDPL2406001066TF-5 (2024). Refer to the full report, especially its model identification and page 19 single-span results. The separately published SGS report QDPL2406001066TF-4 (cable ladder) is for a different set of named test specimens and should be assessed separately.
- HFJD — Cable Tray Load Capacity Guide. General loading concepts.
- HFJD — Cable Tray Support Spacing Guide. General support planning considerations.
Engineering note: This article explains publicly documented test concepts and one identified report. It is not a substitute for the full licensed standard, a project-specific structural design or approval by the responsible engineer. Values from the cited verification report must not be transferred to other configurations without supporting evidence.